Alternatives Analysis, Highway 101 Widening Project — Final Report
A Recommended Multimodal Transportation Strategy
Each of the "analysis alternatives" to the highway widening is predicted to result in a reduction in forecast vehicle trips in the Corridor. The packages were intentionally designed to provide substantially different approaches to accommodating travel demand, ones which do not overlap or duplicate each other. In this way, it is possible to assess the degree of effectiveness of the widely different solutions individually, recognizing that the ultimate alternative to the highway widening for the Corridor lies in some combination of each of the three. Implementation strategies identified in Chapter 4 itemize incremental steps which may be used in many combinations to produce an alternative to the Highway 101 widening. While the Pricing/Enhanced TDM "analysis alternative" is forecast to be the most effective in reducing vehicular travel in the Highway 101 Corridor, the two transit-focused alternatives result in a significant increase in transit trips in the Corridor, which was not a result of the Pricing/Enhanced TDM alternative.
A multimodal combination of strategic actions is identified which provides an alternative to widening Highway 101 prior to the year 2015. This chapter proposes a schedule of time frames during which actions should occur. It also identifies the key agencies or participants responsible for the action. Finally, it identifies the planning or funding document in which actions can be programmed, funded, provided and monitored. To the extent possible, existing planning and programming studies {e.g. Regional Transportation Plan (RTP), Congestion Management Plan (CMP), and Regional Transportation Improvement Program (RTIP) updates} are recommended as the tools to address many of the technical needs and policy issues which require future actions. The broad nature of this Highway 101 Alternatives Analysis study necessitates further, more specific studies in order to develop detailed implementation approaches for each of the recommended actions. Where a special study or report is needed, one is identified. More detailed design, environmental, cost and financing studies will be needed to refine recommendations for these plans and programs.
The recommended actions can only be accomplished with changes to the current priorities and distribution of presently available transportation funding set forth in SBCAG's RTP and RTIP, MTD's annual budget and its Short Range Transit Plan (SRTP), as well as in the local jurisdiction's annual budgets and capital improvement programs.
The purpose of this Alternatives Analysis of the Highway 101 Corridor study was to identify alternatives to the widening of Highway 101. The fundamental choice between widening Highway 101 or implementing the recommended alternative cannot be determined in this study report. Inherent in any set of recommended actions are the underlying policies which must be determined by those who set the region's transportation policies. It remains a fundamental policy issue for SBCAG's Executive Board. There are, however, additional policy issues to be addressed, should this alternative to the Highway 101 widening be selected for the South Coast's near term future. The chapter concludes with key policy issues which SBCAG and local jurisdictions must address as a basis for the successful implementation of a multimodal transportation strategy.
5.1 An Alternative Multimodal Transportation Strategy to Widening Highway 101
A multimodal transportation strategy is proposed as one alternative to widening Highway 101 for at least the next fifteen to twenty years. The multimodal transportation strategy builds from key elements of the Pricing/Enhanced TDM "analysis alternative" while incorporating selected elements from the bus and rail transit "analysis alternatives" into an integrated and phased program. Seven elements are recommended as a basic framework for the multimodal transportation strategy:
- Enhance the City/County TDM Ordinance and Traffic Solutions programs
- Expanded transit services
- Bicycle system improvements
- Highway 101 operational improvements
- Land use planning considerations to facilitate use of alternative modes
- Strategies to reduce visitor/tourist auto trips
- Performance monitoring of Highway 101
The strategic nature of the alternative approach is achieved by continually using feedback from monitoring and demonstration efforts to make regular adjustments to the action program's priorities, timing and emphasis, Only through such "fine tuning" can this alternative be adjusted and refined to respond to the individual and cumulative effects of its seven components. The recommended actions are proposed to accomplish several objectives:
- Introduce multimodal transportation services into the South Coast area
- Provide a proportionate level of improvements as congestion increases
- Promote a gradual shift in modal choice away from dependence upon the single occupant automobile among travelers
- Establish a strategic programming effort of capital and operational changes in response to monitored levels of congestion and shifting mode choice in the South Coast area
- Identify responsible agencies and organizations to implement the component actions, and
- Incorporate necessary planning, programming, monitoring, promotional/educational and demonstration activities in advance of the actual need for a given action.
The multimodal transportation services strategy sets forth an implementation schedule to guide policy makers, public agencies and residents of the South Coast in the transition from an automobile dependent community to one in which a variety of transportation modes successfully compete to accommodate travel demands and provide acceptable levels of service. Table 5-1 identifies the detailed elements of each of the seven components of the recommended alternative, and the five year time periods within which the actions should be completed. Recommendations are intended to be phased in over time, as traveler response warrants the expansion of services and programs. While the overall list of recommendations has not been prioritized, within each of the components high priority actions have been identified. The following subsections describe each of the seven elements of the recommended multi-modal transportation strategy in more detail.
Table 5-1
Implementation Schedule
| ELEMENT | Implementing Agencies 1 | Related Planning or Programming Documents2 | Monitoring/ Performance Evaluation Tools2 | 1995-2000 | 2000-2005 | 2005-2010 | 2010-2015 | |
|---|---|---|---|---|---|---|---|---|
| 1 | ENHANCED TDM ACTIONS | |||||||
| 1.1 | Enhanced Data Collection | Traffic Solutions, Employers | NA | Annual Report to SBCAG & funding agencies | ***** *** *** |
***** *** *** |
***** *** *** |
*** ** **** |
| 1.2 | Strategy Effectiveness Assessment | Traffic Solutions, Employers | NA | Annual Report to SBCAG | **** ***** |
|||
| 1.3 | Expanded Ordinance Coverage | Traffic Solutions, Carpinteria, Chamber of Commerce, Employers | City & County Ordinance | CMP reports & Annual Report to SBCAG and funding agencies | ***** **** |
|||
| 1.4 | Expanded Promotional Activities | Traffic Solutions, MTD, Visitors & Convention Bureau | NA | Annual Report to SBCAG & funding agencies | ***** *** *** |
***** *** *** |
***** *** *** |
*** ** **** |
| 1.5 | Establish Pricing Demonstration Program | SBCAG, Local Jurisdictions, Chambers of Commerce, SBIA, COLAB, Downtown Business Groups, Convention and Visitors Bureau | SBCAG OWP, RTIP | Special Study to SBCAG and Local cities & county, CMP reports | ***** **** |
|||
| 1.6 | Remote Parking Facilities | SBCAG, local governments | General Plans, RTIP, local CIPs | Special Study or component of City of Santa Barbara's Parking Revenue Reports | **** ***** |
|||
| 1.7 | TDM Ordinance Review and Revision | Traffic Solutions, Employer Representatives (e.g. SBIA, COLAB), | NA | Revised Ordinance | **** ***** |
|||
| 1.8 | Revised Ordinance Performance Monitoring | Traffic Solutions, Employer Representatives | NA | Annual Reports to SBCAG & Funding Agencies, CMP reports | **** ***** |
|||
| 1.9 | Expanded Public Education Program | Traffic Solutions, AIA's local Sustainability Project | NA | Annual Report to SBCAG & Funding Agencies | **** ***** |
|||
| 1.10 | Funding Strategy - Enhanced TDM Actions | Traffic Solutions | RTIP, SBCAG OWP, local jurisdictions' annual budgets | Special Report to SBCAG, City and County of Santa Barbara | ***** *** *** |
|||
| 2 | EXPANDED TRANSIT SERVICES | |||||||
| 2.1 | Express Bus Service Oxnard/ Ventura to Carpinteria, Downtown Santa Barbara, Goleta & USCB via the Hollister Corridor | MTD, SCAT, SBCAG, & VCTC | SRTP, RTIP, RTP | MTD, SCAT operations reports & on-board surveys | **** ***** |
|||
| 2.2 | Operations Planning Study | MTD & SBCAG & local agencies | SRTP, RTIP, RTP | Special Report to MTD, SCAT, VCTC & SBCAG's Boards | **** ***** |
|||
| 2.3 | Funding Strategy - Expanded Transit Services | MTD, SBCAG, Caltrans, local agencies | SRTP, RTIP | Special Report to MTD, SCAT, VCTC & SBCAG's Boards | **** ***** |
|||
| 2.4 | Freeway Flyer Stop Development | MTD, SBCAG, Caltrans & Local cities & county | SRTP, Local Plans & CIPs | Special Report to Caltrans, MTD, SBCAG & local jurisdictions | **** ***** |
|||
| 2.5 | Park & Ride Facility Development | MTD, SBCAG, Caltrans & Local cities & county | SRTP, Local Plans & CIPs | Special Report to Caltrans, MTD, SBCAG & local jurisdictions | **** ***** |
|||
| 3 | BICYCLE SYSTEM IMPROVEMENTS | |||||||
| 3.1 | Complete Missing Segments & Install Identified New Facilities (Phase 1) | SBCAG, Caltrans & Local cities & county | RTIP, Measure D Program and local CIPs | RTIP, Measure D Reporting, Special Report to SBCAG | **** ***** |
|||
| 3.2 | Complete Regional Bikeway Program's Intermodal Connection Program | SBCAG, Caltrans & Local cities & county | RTIP, local CIPs, & MTD's SRTP | SRTP, RTIP, Measure D Reporting, Local CIPs & Plans | **** ***** |
|||
| 3.3 | Regional Bikeway Program's Funding Actions | SBCAG, Caltrans & Local cities & county | RTIP and local CIPs | SRTP, RTIP, Measure D Reporting, Local CIPs & Plans | **** ***** |
|||
| 3.4 | Complete Regional Bikeway Program's Interjurisdictional Actions | SBCAG, Caltrans & Local cities & county | RTIP and local CIPs | Special Report to SBCAG & local jurisdictions | **** ***** |
|||
| 3.5 | Complete Missing Segments & Install Identified New Facilities (Phase 2) | SBCAG, Caltrans & Local cities & county | RTIP and local CIPs | SRTP, RTIP, Measure D Reporting, Local CIPs & Plans | **** ***** |
|||
| 4 | HIGHWAY OPERATIONAL IMPROVEMENTS | |||||||
| 4.1 | Ramp Metering Program | CALTRANS, SBCAG, & local agencies | Caltrans District 5 Traffic Operations Plan, CMP, RTIP | CMP Reports, Special Traffic Operations System (TOS) Report | **** ***** |
|||
| 4.2 | Interchange Improvements | CALTRANS, SBCAG, & local agencies | Caltrans District 5 Traffic Operations Plan, CMP, RTIP | CMP Reports, Special Traffic Operations System (TOS) Report | **** ***** |
|||
| 4.3 | Electronic Detection System Monitoring Stations | CALTRANS, SBCAG, & local agencies | Caltrans District 5 Traffic Operations Plan, CMP, RTIP | CMP Reports, Special Traffic Operations System (TOS) Report | **** ***** |
|||
| 4.4 | Incident Response Program | CALTRANS, SBCAG | Caltrans District 5 Traffic Operations Plan, CMP, RTIP | CMP & SWITRS Reports | **** ***** |
|||
| 4.5 | Changeable Message Sign | CALTRANS, SBCAG, & local agencies | Caltrans District 5 Traffic Operations Plan, CMP, RTIP | CMP Reports, Special Traffic Operations System (TOS) Report | **** ***** |
|||
| 4.6 | Highway Advisory Radio System | CALTRANS, SBCAG, & local agencies | Caltrans District 5 Traffic Operations Plan, CMP, RTIP | CMP Reports, Special Traffic Operations System (TOS) Report | **** ***** |
|||
| 5 | TRANSIT ORIENTED LAND USE PROGRAM | |||||||
| 5.1 | Establish Policy based Commitments from Local Governments | SBCAG & local governments | Local General Plans and Community Plans | Special Report to City Councils, Board of Supervisors & SBCAG | **** ***** |
|||
| 5.2 | Develop Transit Supportive Urban Design Packages for Selected Station Locations | SBCAG, MTD & local governments | General Plans, Redevelopment Plans Overlay Zones | Special Report to City Councils, Board of Supervisors & SBCAG | **** ***** |
|||
| 6 | VISITOR / TOURIST TRIP REDUCTION PROGRAM | |||||||
| 6.1 | Establish a Tourism Travel Consortium & Incentive Program | Traffic Solutions; Conference & Visitors Bureau; local hotel, restaurant, retailers, AMTRAK, MTD, City of Santa Barbara & SBCAG | Special Report to SBCAG, MTD Boards, City Councils, Conference and Visitors Bureau Board of Directors | **** ***** |
||||
| 7 | HIGHWAY 101 PERFORMANCE MONITORING | |||||||
| 7.1 | Continue Highway 101 Performance Monitoring | Caltrans & SBCAG | Caltrans Annual Traffic Count Report | ***** *** *** |
***** *** *** |
***** *** *** |
**** ***** | |
| 1. Metropolitan Transit District (MTD), Santa Barbara
Industrial Association (SBIA), Coalition for Labor, Agriculture and Business
(COLAB), South Coast Area Transit (SCAT) 2. Overall Work Program (OWP), Capital Improvements Program (CIP), Regional Transportation Improvement Program (RTIP), Regional Transportation Plan (RTP), Short Range Transit Plan (SRTP) | ||||||||
5.1. Enhance the City/County TDM Ordinance and Traffic Solutions Programs
Continue to market and enhance the City/County Travel Demand Management (TDM) ordinance (Traffic Solutions program) which is oriented to commuter trips to include more employers/employees. Begin to experiment with financial incentives for ridesharing and using transit.
Individual elements recommended to result in an enhanced TDM effort include:
- Traffic Solutions in conjunction with local employers, MTD and SBCAG, should collect more and better evaluative data on individual employer strategy effectiveness at reducing HOV trips,
- Traffic Solutions should assess the current, most effective, TDM strategies and their applications based on local and national experience. (Comsis et. al.)
- Expand Promotional Activities for Enhanced TDM. Traffic Solutions should target during the next few years its promotional activities aimed at employers to focus on those TDM strategies which have been identified as effective. Promotional activities should include transit subsidies, a parking cash out program, 4/40 work schedules, and telecommuting.
- Traffic Solutions, in coordination with MTD, should encourage employers and MTD to experiment with financial incentives for transit ridership.
- SBCAG, in association with the local chambers of commerce, the Santa Barbara Conference and Visitors Bureau, the Santa Barbara Industrial Association, the Coalition for Labor, Agriculture and Business, Grass Roots 101 and other local business and advocary groups should develop a parking pricing demonstration program in the Highway 101 Corridor. Such a demonstration program should quantify how a parking pricing program affects employee trip reduction and local businesses.
- Traffic Solutions should establish a TDM ordinance review committee which includes local business community and citizens group representation to review the existing TDM ordinance provisions.
- Traffic Solutions should evaluate the effectiveness of the enhanced TDM ordinance in conjunction with the Congestion Management Plan (CMP), two and five years after the ordinance revision, if pursued.
- Establish an expanded education effort through Traffic Solutions to include broader information targeted at the general public, as well as the tourist, business traveler, and visitor.
- SBCAG and its member agencies should develop a funding strategy with identified funding sources for the enhanced TDM activities identified for Traffic Solutions.
Each of the specific recommendations is discussed in more detail below.
1. & 2. Enhanced Data Collection and Strategy Effectiveness
Assessment
Traffic Solutions has been very successful in achieving employer
interest and participation, but has not yet achieved full compliance with the
AVR targets of the existing ordinance. However, the level of participation of
the employers and their employees in voluntary compliance with the ordinance, in
its present structure, may not be sufficient to achieve the regional
participation rate of 65% established in the ordinance. Data gathering efforts
should focus on which of the individual strategies used by employers under the
present ordinance results in the greatest trip reduction shifts in the South
Coast. This may vary among employment sectors. Data needs include up-to-date
information on current mode of travel, prior mode of travel, travel distance,
awareness of alternatives and promotions, program costs, and site
characteristics. Current data collection efforts should focus on these elements
in order to provide input to the TDM ordinance review planned for 1997 to
facilitate possible enhancements. Programs in Phoenix in Maricopa County, and
Tuscon in Pima County, Arizona evaluate individual employer plans to determine
the individual strategies which result in the greatest reductions in SOV driving
(Comsis, 1993) These findings are reported back to TDM program participants so
they can adjust and improve the effectiveness of their programs.
3. Expanded Promotional Activities
The Traffic Solutions TDM program should continue to be
aggressively marketed as an effective and community-friendly solution to solving
traffic problems. Expanded marketing efforts could include special promotional
days such as drive-free or rideshare days. Coordination with MTD will be a
critical element of this action. In Los Angeles County, "Rideshare
Thursday" has been a regular promotion of a consortium of transportation
agencies including Caltrans, Commuter Transportation Services, Commuter Computer
and others, however, vehicle trip reductions as a result of this promotion have
yet to be verified. Greater Cleveland's Regional Transit Authority promotes a "Try-Transit"
week each May with focused promotional activities and free bus and rail coupons.
MTD and Traffic Solutions could develop a prototype program which
could be targeted at commuters as well as visitors. Visitor transit ridership
promotions could coincide with special events in the Santa Barbara area or as
part of peak tourist season promotion. Several seasonal events which could
maximize transit connections include the County Vintner's Festival in April,
Santa Barbara Summer Solstice Day in June, The Fiesta in August, and Memorial
Day, Independence Day and Labor Day celebrations during the summer.
4. Financial Incentives
This could be in the form of "transitchecks" whereby employers can
buy discounted bus passes from MTD, passing the savings along to their
employees. Financial incentives could also be applied to carpooling, which
would serve as an additional inducement to preferential parking already provided
by many employers. Examples of financial incentives are based on evaluations of
public and private sector employers including County of Ventura, Allergan in
Orange County, Union Bank in Los Angeles, and Varian in Palo Alto. Evidence
suggests that financial incentives for the use of commute alternatives are
effective in reducing trips by 8 to 18 percent in an evaluation of over twenty
employer based TDM programs, (Comsis, 1993).
5. Parking Pricing Demonstration Program
Establishing a pricing demonstration study in the Corridor area will not
only provide a realistic basis to assess the effects on local businesses as well
as the traffic impacts, but could also serve as the source of a reasonably
available funding match with which to leverage federal and state revenues for
needed capital improvements. Pricing incentives or disincentives include:
establishment of a parking fee, transit fare reductions or employer subsidized
transit passes, employer parking fees or "cashout" programs, parking
discounts for carpools and vanpools, discount fuel purchase programs, or
congestion pricing programs. The demonstration project could be limited to
downtown parking lots or to several volunteer employers.
In a study entitled An Opportunity to Reduce Minimum Parking Requirements (Shoup, 1995), providing free parking was estimated to induce more auto travel than providing free gasoline. When an employer at the Warner Center in the San Fernando Valley increased employee parking fees from zero to $30 per month, the share of solo drivers dropped from 90 percent to 46 percent and average vehicle occupancy rates increased from 1.08 to 1.55 persons per vehicle. One method of instituting employee parking pricing is to require employers who currently provide free parking to their employees to instead offer their employees the option of receiving the cash equivalent of the parking space and making their own arrangements for parking (parking "cashout" policy). In a recent study by Seattle Metro Cash In Your Car: Cashing Out Employer Subsidized Parking, (Seattle Metro, June 1994) cash out programs were evaluated at three employers (Digital Equipment Corporation in Bellevue, Ernst Corporation in downtown Seattle, and Minor & James Medical on First Hill in Seattle. Between two and fifteen percent of eligible employees chose to cash out parking. By implication all who cashed out switched from SOV to an HOV mode. The majority switched to transit due to the presence of extensive transit service to employer locations. All employers in the study have good transit access and are located in areas which are urban in character (Seattle Metro, June 1994).
The County and cities have the enabling authority to mandate these types of programs, but it will be very controversial. The usefulness of a demonstration program is that it can provide a quantified basis which all affected segments of the community can discuss regarding the trip reduction effectiveness of the strategy.. The participation of a wide range of special interest groups in the demonstration program development would be important to the overall credibility of the results. Furthermore, local business interests can recommend the inclusion of specific measurements of program impacts, such as changes in retail sales, volume or value, to insure that any economic effects of the demonstration program are quantified.
6. TDM Ordinance Review and Revision
At the time of TDM ordinance review in 1997, Traffic Solutions
should establish a carefully chosen ordinance review committee which reflects
the broad range of business and citizen transportation interests in the county.
In order to achieve a realistic alternative to widening Highway 101, revisions
to the ordinance should be structured to result in maximum ridesharing results.
The success of a multimodal alternative to the widening will occur through the
achievement of performance targets and resulting monitoring programs of the
area's rideshare ordinance and based on the review described earlier.
Based on the enhanced data and performance records collected in the first two actions, Traffic Solutions, The City and County of Santa Barbara should consider revising the employer participation rate target (higher than current levels) and the employer performance target to a level determined by current needs as measured by the Congestion Management Plan (CMP) and associated deficiency plans. The ordinance should also establish a two year performance threshold for the increased targets. If employers fail to achieve the regional AVR target, specific incentive measures would be prescribed by Traffic Solutions.
The Pricing/Enhanced TDM "analysis alternative" included participation rates for modified work schedules and telecommuting based on a national average in order to estimate the effect on trip-making and resultant traffic congestion in the Study Area. The evaluated rates reflect the national average participation rates if employees were offered modified work schedules and telecommuting. The establishment of specific employer participation rates for modified work schedules and telecommuting should be developed in a collaborative arena with the active participation of the local business organizations and transportation advocary groups. Specific participation rates could and should vary based on the type of business, and the availability of transit services to the employer's site. The linkage between participation rates for various modified work schedules and employer performance in achieving an average regional AVR, however, is an important step towards implementing an alternative to the highway widening. Individual employers could set variable thresholds for modified work schedules and telecommuting to meet an increased AVR target.
Recent evaluations of the South Coast Air Quality Management District's Rule 1501 by local employers, (Los Angeles Times, March 28, 1995) noted that
". . . some employers have found it necessary to simply change their work hours to achieve the goals. In Riverside, recreational vehicle maker Fleetwood Enterprises had met ridership targets at all but one facility: the corporate headquarters. The large number of workers with often long and unpredictable hours were resistant to giving up solo commutes. So Fleetwood put the headquarters on a nine-hour workday and closes it every other Friday to reduce vehicle trips."
The modified work schedules can have the effect of focusing trip reductions on Fridays, when tourist trips arriving in the Santa Barbara area are higher than other weekdays.
TDM ordinance revisions should consider the expansion of the ordinance to address home to school trips, particularly at UCSB and Santa Barbara Community College (SBCC). This can build on the high bike mode share at the UCSB campus. As transit services to the campuses are expanded, ordinance revisions which identify incentive strategies to students to carpool or take transit can be targeted. MTD discontinued Route 18 service to the UCSB campus due to declining ridership according to the 1992 SRTP Update (MTD, 1992). Reintroduction of service in consort with inclusion of UCSB and SBCC commuters under the ridesharing ordinance should occur in a coordinated fashion. MTD's and Traffic Solution's promotional activities in these areas could help with this effort. The University of California at Los Angeles has been successful in coordination of transit service with the Southern California Rapid Transit District to provide greater access by alternative modes. The City of Los Angeles provided "DASH" shuttle bus service in the Westwood area of Los Angeles has also proven successful in supporting the ridesharing efforts of employers and students. However, California State University at Fullerton had unsuccessful results when they established a shuttle bus service in 1989. Three years later the shuttle was shut down (Sanchez, 1995). Efforts to expand into the campus travel market with ridesharing programs have been shown to have both successes and failures. Efforts made in Santa Barbara should build on the identified successes and avoid the problems experienced elsewhere.
An additional area to consider in the expansion of the local TDM ordinance is to include provisions for special event AVR targets. In general, AVR to special events is higher than that found in home based work trips. The South Coast Air Quality Management District has had an ongoing advisory committee with "special trip generators" including such facilities as Disneyland, sporting venues, and concert facilities, to develop specific AVR targets for special activity centers. Expansion of the ordinance into these areas should be considered although the opportunities may be limited to large events at the college campuses.
7. Revised TDM Ordinance Performance Monitoring
Once TDM ordinance revisions have been enacted by local jurisdictions,
efforts to monitor ordinance effectiveness should be established. Effects of
individual strategies should be monitored through employer reporting to Traffic
Solutions and serve to provide further refinements to the ordinance. In
general, a revised ordinance performance monitoring effort should result in
greater integration between the existing monitoring efforts of SBCAG and local
jurisdictions for CMP purposes, Traffic Solutions for TDM performance,
and MTD's existing route and system performance monitoring. Evaluation criteria
for TDM strategies include the need to consistently and vigorously measure: the
use of alternatives, calculation of trip reduction and vehicle miles traveled
(VMT), contribution of specific strategies, and program cost effectiveness.
Annual surveys and data processing techniques can be developed to support the
evaluation process. In addition to overall performance of the ordinance,
efforts should be made to look at individual plan performance in comparison with
local roadway traffic and transit ridership in the vicinity of the reporting
businesses. Cost effectiveness and individual measures within each employer's
program are two performance criteria critical to this enhanced ordinance
monitoring.
The results of congestion monitoring on the county's designated CMP system of roads and intersections should also be compared with performance reporting at adjacent and nearby employers. These comparisons can provide Traffic Solutions with guidance in developing specific ridesharing strategies with employers located along or on the way through particularly congested portions of the road system. These comparisons support the strategic selection of TDM strategies for specific areas within the county.
Concerns were expressed by the business community at public meetings that job loss in local businesses has not been considered in the TDM ordinance performance evaluations, and that these changes should be compared with recent traffic growth in the Corridor as a means to assess whether there is reason to modify performance targets. The effects of employment changes and housing growth in the entire county could be compared with the changes in AVR and AVO over time, however, the more specific travel characteristics of an individual employer would also need to be considered. Comparisons of the actual versus projected rates of employment and housing growth with actual versus forecast traffic growth and AVO rates are important comparisons to be looked at when evaluating performance thresholds as well as specific strategies to be applied in subareas of the county. Further comparisons of AVR performance for employers along selected roadway corridors or areas of high employment concentrations could be made with MTD's regularly gathered information regarding farebox return and ridership rates for individual bus routes serving these areas. Subareas of the county could be considered for employer provided TDM strategies which create incentives for transit use. The CMP program could consider incorporating specific TDM performance thresholds as part of CMP "deficiency plans" on selected roadways with high employment concentrations. If thresholds are not met, more prescriptive measures should be considered for adjacent employer programs which could then be incorporated into deficiency share analysis of intersection traffic flow (Olen Pointe Finance and Engineering Study ) which can quantify contributions to the traffic flow by different developments or sites. Linking intersection performance to the employer incentive program could be considered.
8. Expansion of the "Traffic Solutions" Public Education Program
Much research has been conducted recently regarding the hidden costs or
subsidies of automobile use in America (see discussion in
section 4.2.3 of Chapter 4). Much of this
analysis, while not directly measuring costs or subsidies in Santa Barbara, is
directly applicable to Santa Barbara. Litman (1995), Cameron, (1994), Shoup,
(1995) and Handy and Mohktarian, (1995) all conclude that the elimination of
these subsidies through policies or actions which result in the "hidden
auto costs" being charged to automobile users will result in the greatest
reduction in single occupant vehicle use.
Traffic Solutions' recent promotional materials includes information
regarding the true cost of driving. These approaches should be continued and
expanded. Brochures with this information include: Introducing 7 Great
Ways to Get There in Santa Barbara County, Let's Work Together Let's
Clean the Air (Busing and Vanpooling slip sheets include specific cost
savings) and Share a Van Save a Bundle. A second area of education
could include the definition and benefits of "transit oriented" design
(see the more detailed description of land use redesignations into transit
oriented design in Section 5.1.5). The third area of
public education is to inform the community of the purpose, extent, duration,
methods, and results of a pricing demonstration program.
The greatest impact of an expanded education campaign is its anticipated benefit to establishing business and community awareness and acceptance for the recommended pricing demonstration project(s). Secondary results will include some minor shifts in mode choice or reductions in single occupant vehicle travel. Shoup (1995) indicates that it is the application of the direct cost to the driver which results in the change. Knowledge of hidden costs of auto operation will have a limited effect on mode choice. Although the secondary benefits of this education program are expected to be negligible, the education effort is a strategic element in the development of community consensus to cause changes in land use policy, parking policies and the development of financial strategies to fund implementation of these alternatives to the widening of Highway 101. The education effort can be particularly beneficial in the development of a parking pricing demonstration project.
Recent activities by the Sustainability Project in Santa Barbara County have focused on two areas, transportation's relationship to overall community character and the land use/transportation linkage. The Sustainability Project has conducted forums on the first subject and is developing additional activities around both subjects. The Sustainability Project can provide an additional approach to community education regarding the hidden subsidies to the automobile and the concept of "transit oriented design" as described in section 4.2.4, Measures of Community and Environmental Impact, of this report. The Sustainability Project, the Conference and Visitors Bureau, business associations, and other grass root organizations could be encouraged to participate in this effort to ensure that factors tailored to Santa Barbara are included.
9. Development of a Funding Strategy
The recommended actions call for expanded TDM services to be provided by
Traffic Solutions. Funding sources for these activities should be
identified in conjunction with overall funding needs for the Multimodal
Transportation Strategy. Cost estimates for individual activities for
Traffic Solutions as well as the costs to local employers for expanded
implementation and reporting requirements should be developed at the time of
ordinance review and revision. The Measure D Strategic Plan of expenditures
supports Traffic Solutions. Other possible sources include developer
impact fees, student fees for transit and Caltrans' TDM funding. However,
availability of these funds, particularly Caltran's programs, is increasingly
uncertain.
To the greatest extent possible, ISTEA's flexible funding sources should be used for the expanded program. However, there will be stiff competition for these funds with other capital improvement elements of this program such as the transit, bicycle and highway operational improvements. One of the benefits of establishing a parking pricing demonstration program is that the study should provide a realistic measure of both the revenues and costs which could be expected from the full application of such a demonstration. Revenues from parking fee program alternatives should be estimated to quantify potentially available monies to fund non TDM elements of the recommended strategies (i.e. enhanced transit services, enhanced bicycle services, and unfunded highway operational improvements.) This evaluation should estimate near term (5-10 year) cash flow availability as a result of bonding future revenues. Cost estimates can build from information provided in this study but should also incorporate specific information from individual elements. The funding strategy should be combined with others identified in this report into a single, phased revenue and cost projection which can be incorporated into regional funding programming documents.
5.1.2 Expand Transit Services
Implement additional express bus services and/ or vanpool programs from Ventura County and Carpinteria to downtown Santa Barbara, Goleta, and UCSB. Market and promote them and monitor ridership trends.
Five action elements are recommended to provide expanded transit services in the South Coast Area.
- SCAT and MTD should introduce peak period express bus service between Oxnard and Ventura and Carpinteria, Montecito/Summerland, downtown Santa Barbara, Goleta as well as UCSB.
- MTD should prepare an operations study which identifies costs of: additional express bus services, additional local shuttle service to serve express bus stops, freeway flyer transit station locations, and additional maintenance facilities needed to support the expanded service.
- MTD and SBCAG should prepare and implement a funding strategy to implement the recommended service improvements based on the costs identified in the operations study.
- MTD, Carpinteria, the City and County of Santa Barbara, SBCAG, and Caltrans should prepare a detailed freeway flyer transit station development program which refines and designs transit stations as located in the Highway 101 right of way and construct the stations.
- Caltrans, MTD, Carpinteria, the City and County of Santa Barbara, and SBCAG should develop park and ride lots at selected locations along the Corridor.
Each of these transit recommendations is described in more detail below.
1. Expanded Express Bus Service
Through the coordinated efforts of SBCAG, MTD and South Coast Area Transit
(SCAT) in Ventura, peak hour express bus services should be implemented between
Ventura County, Carpinteria, downtown Santa Barbara, the Hollister Avenue
employment corridor in Goleta and at UCSB. The implementation of express bus
service is part of an incremental program to develop an integrated
transportation system in the Highway 101 Corridor and in the South Coast. The
provision of express bus service, in combination with incentive programs
provided by employers in compliance with the Traffic Solutions TDM
program, will continue the development of awareness of work commute alternatives
to the automobile. Feeder service connections, similar to those described in
the Enhanced Bus "analysis alternative" will require adjustments to
existing MTD service as well as selected new service to create an effective,
commute alternative to driving alone.
The objective of this action is to use significantly less capital-intensive express bus service to build the commuter awareness and community culture which might ultimately lead to ridership levels which might justify and support future rail transit in the Highway 101 Corridor. The express bus service is recommended over the rail options due to the lower cost, the probability of transit use for commuters during morning and evening peak period (Seskin, 1995) based on existing densities in the Study Area, and the flexibility of bus service for routing and service level adjustments, Feeder service route, schedule and frequency adjustments should be coordinated with the express services. MTD and Traffic Solutions together could market the new and revised service. Recommended express bus service will require additional operating subsidies (in the range of $5-$10 million/year) for the foreseeable future. Funding options are described in Section 5.3.
2. Transit Operations Planning Study
In a cooperative effort, SBCAG, MTD and SCAT will need to perform a detailed
operations planning study to prioritize the routes to be improved, the level of
service improvement, service schedules, and funding for the improvements. This
study should identify MTD's needs for additional vehicles, maintenance
facilities and labor needs to expand service levels. The costs and benefits of
alternative service provision methods (e.g. contracted service with private
providers) should be evaluated as part of this study. The operations study
should expand this Highway 101 analysis to include vehicle and maintenance
facilities needs in light of current bus replacement schedules and MTD's
facility consolidation goals (SRTP, 1992). Recommendations should be included
with the next update of the SRTP. In response to later cycles of monitoring and
adjustments (in periods between 2000 and 2015), subsequent changes to transit
service operations should be incorporated in to later updates of the SRTP.
The City of Los Angeles contracts for peak period express bus service on Highway 101 from the San Fernando Valley into downtown Los Angeles in lieu of MTA providing the service. This service operates at capacity in congested traffic on that stretch of Highway 101. The high price of parking in downtown Los Angeles, easy freeway access to bus stops with available parking and a favorable fare structure all contribute to this line's success. Fare structures should be evaluated with a goal of obtaining a thirty percent farebox recovery. The timing of service implementation could coincide with revisions to the TDM ordinance. Transit check programs identified in section 5.1.1 above could enhance ridership on the new express bus service.
3. Funding Strategy - Expanded Transit Services
Results of the Operations Planning Study should be detailed enough to assess
capital and operations costs of additional services. Funding choices for the
expanded transit services may include establishing benefit assessment districts
or charging for parking in the other areas of downtown. Capital cost estimates
should be refined and availability of STP funds for these purchases will need to
be balanced with other eligible funding needs of the key shortfall in the entire
multimodal transportation strategy is for transit operating funds.
Section 5.3 details revenue raising approaches which could
be considered. These are areawide in nature and would require SBCAG, local
jurisdictions and MTD to work cooperatively to develop and implement a funding
strategy, The development of funding sources for transit operations should not
be delayed until a parking pricing demonstration is completed. The need to
establish this funding source early during the first implementation period.
4. Transit Station Development
Development of the intermediate bus transit stops along Highway 101, similar
to those described in the Enhanced Bus Alternative (see Section
3.3.1 in Chapter 3), will make the express bus travel times more competitive
with the automobile than if the buses would have to exit the freeway and
re-enter at each stop. However, even with the intermediate transit station
development, the addition of a single express bus route between Ventura and
downtown Santa Barbara or Goleta, which makes intermediate stops, will not
provide as rapid a trip as multiple express routes starting at various locations
along the Corridor, and providing more direct, "point-to-point"
service. The development of these transit "stations" is compatible
with this express service concept as well. The layouts and designs for these "stations"
should be developed and shared with the community. To the extent that
construction of the stations must occur in stages, SBCAG, MTD and the cities of
Carpinteria and Santa Barbara should act cooperatively to prioritize station
construction, based on the locations which would likely attract the greatest
ridership and provide the greatest level of convenience to potential users.
Ideally, initial station construction would distribute intermediate stops at
regular intervals along the entire length of the recommended express bus service
area (initially implementing only three or four of the seven stations that were
proposed in the enhanced bus transit package). Express bus stop designs should
be coordinated with Caltrans operational improvement design and construction as
close to interchanges as possible. Interchanges at the following locations
should consider direct bus connectors or bypass ramps:
- Carpinteria at the Linden Avenue/Highway 101 interchange,
- Summerland at the Via Real/Evans Avenue/Hollister Street/Highway 101 interchange,
- Montecito at the San Ysidro Road/Highway 101 interchange,
- Downtown Santa Barbara at the Castillo Street/Highway 101 interchange,
- Five Points at the La Cumbre Road/Las Palmas Drive/Highway 101 interchange, (Measure D project), and
- Goleta at the Hollister Avenue/Route 217 interchange.
5. Park and Ride Facility Expansion
Park and ride facility expansion is recommended to include both express
transit related locations as well as other remote locations from local
downtowns. Early implementation of transit stations/stops proposed to include
park-and-ride lots (Carpinteria, La Cumbre, Goleta and Isla Vista) should be
made a priority. Under the Enhanced Bus alternative, only the freeway express
bus stops in Carpinteria, La Cumbre, Goleta and Isla Vista were estimated to
have sufficient undeveloped land for the provision of park-and-ride lots.
Parking lot size was estimated at 25-50 cars due to the limited availability of
land. The remainder of the transit stops would be accessible only by walking,
transit or via shuttle from remote parking facilities. In addition, efforts
should be made to coordinate connections in Ventura County at locations which
could support park-and-ride facilities. Cost estimates for right-of-way,
construction and maintenance should be developed and incorporated into the
recommended funding strategy for expanded transit services. Coordination with
Caltrans' freeway operations plans and with the Measure D strategic plan would
facilitate integrated design between interchange reconstruction, transit station
location and access between the two. The location of additional park-and-ride
lots at Montecito, Carpinteria, La Cumbre, Goleta and Isla Vista with direct
transit service connections could support both existing MTD service as well as
expanded transit service within the Highway 101 Corridor. City, County, MTD and
Caltrans participation in the site selection, development and maintenance is
essential if these lots are to be developed. Subsequent recommendations for
expanded express bus service would benefit from additional remote parking
locations, providing greater access to transit.
5.1.3 Implement Bicycle Systems Improvements
Implement the regional bikeway facility plans and work with bicycle groups, local employers and MTD to promote use of facilities and coordinate bike ancillary facilities (e.g. lockers, showers, racks on buses, etc.)
Climate and terrain combine in Santa Barbara to provide an hospitable environment for bicycling as an alternative to single occupant vehicle use for both work trip and recreational trips in the Highway 101 Corridor. SBCAG's Regional Bikeway Study (SBCAG, 1994) identifies a broad based action program for bicycles for the entire county. Those elements particularly relevant to the Highway 101 Corridor are reiterated here. These actions have been grouped into five recommendations to be accelerated in this Corridor:
- Complete the missing segments and install identified new facilities - Phase I.
- Complete the Regional Bikeway Program's (SBCAG, 1994) intermodal connection action program.
- Complete the Regional Bikeway Program's (SBCAG, 1994) funding action program.
- Complete the Regional Bikeway Program's (SBCAG, 1994) inter-jurisdictional action program.
- Complete the missing segments and install identified new facilities - Phase II.
Each of the specific actions is described in more detail below.
1. Phase I Bicycle Facilities
In order to effectively promote bicycling as an alternative to the automobile for travel along the Highway 101 Corridor, safe and convenient bikeway facilities need to be available. All of the bikeway facilities identified for implementation in Chapter 3 are included in the Regional Bikeway Study (SBCAG, 1994). Design and implementation of these facilities, referred to here as Phase I, should begin as soon as funding can be made available. (Note: this list assumes the construction of the Class II bikelane on Mission Street from San Pasqual to Castillo has been funded and will be constructed in 1995.) Priority should be given to facilities which improve system safety and connectivity including:
- Installation of a Class II bikeway on Linden Avenue from Beach to El Carro (to be coordinated with interchange improvements).
- Installation of a Class II bikeway along Via Real between Padaro Lane and Santa Ynez Avenue.
- Construction of Class I Pacific Coast Bikeway. It would provide a continuous bike path, separated from roadway facilities, for the entire length of the Corridor. The design of such a facility would need to be coordinated with other transportation planning activities concerning the Southern Pacific right-of-way including the potential extension of Metrolink commuter rail into Santa Barbara or the development of urban rail transit within the right-of-way.
- Completion of the missing segment of the Cabrillo Boulevard Bikeway (Cliff Drive segment).
- Installation of a Class II bikeway on Canon Perdido Street from Bath Street to Alisos Street, and on Alisos Street from Canon Perdido to Highway 101.
2. Intermodal Connection Action Program
SBCAG and Traffic Solutions should coordinate with bicycle groups such as the Santa Barbara Bicycle Coalition to identify measures which could be incorporated into the TDM program, such as the mandatory requirements for employers to provide bike lockers, changing rooms and showers to promote bicycle commuting. These recommendations could be brought to the table as part of the TDM ordinance revision (see Section 5.1.1 above). The degree to which these elements are incorporated into revisions to the TDM ordinance, as part of more prescriptive measures to be undertaken, should be based on the strategy evaluation task described in Section 5.1.1 above. Intermodal facilities described in the Regional Bikeway Study (SBCAG, 1994) include MTD's downtown transit center, parking lots # 2 and #3 in downtown Santa Barbara, the parking lot near MTD's bus stop in downtown Goleta, and at the Santa Barbara Train Station.
SBCAG should actively promote and support MTD in the next step of the bicycle rack evaluation program. The first step in the program was to confirm the operational practicality of installing bicycle racks on the fronts of buses. Bike racks were installed on the fronts of two buses on the State Street route. The next step involves the identification of passenger user requirements, and establishing potential use levels. Cost and scheduling of an expanded program, based on the next phase of evaluation, should be included in future SRTP and the RTIP. Bike rack capital and installation costs are estimated at $800 per rack in the Regional Bikeway Study. The study identifies the following routes as "good choices" within the MTD's South Coast services: routes between Goleta and Santa Barbara or Carpinteria, Clean Air Express commuter service between North and South Coast areas, and service between Ventura County and the South Coast. Successful examples of bike and ride service include San Luis Obispo Regional Transit Agency (SLORTA) service between San Luis Obispo and Santa Maria with usage of four commuting cyclists per day and Monterey Salinas Transit (MST) with usage of approximately 1.5 cyclists per day. The distance, terrain and, at times the wind, between Santa Barbara and Carpinteria make these services a good choice for bike and ride.
3. Funding Strategy
The Regional Bikeway Study includes a description of available funding sources for bikeway improvements. Identified funding sources include gas tax, Local Transportation Fund, bikeway allocations, developer fees and State Transportation Fund Bicycle Lane Account grants, and federal Transportation Enhancement Activities. The priority for recommended bicycle improvements in the Regional Bikeway Study does not appear to be related to mode shift efforts in the South Coast area or elsewhere in the county. Actions in the study's funding improvement section should be expanded to include a consistent costing basis. Funding options should consider the recommended funding approaches in Section 5.3 of this chapter. This funding strategy should not be delayed for the results of the pricing demonstration program.
4. Inter-jurisdictional Action Program
The goal identified in the Regional Bikeway Study for inter-jurisdictional issues is to complete a regional bikeway system which is consistent with local jurisdiction's bikeway planning efforts and emphasizes the facilitation of inter-jurisdictional connections. Action items are identified for both SBCAG and local jurisdictions. Coordination in the development of facilities across jurisdictional boundaries, establishment of joint user agreements to allow for bicycle use in utility easements, drainage facilities and along railroad Corridors are some of the actions identified in this area. Maintenance is a third are which is identified in inter-jurisdictional programs. The use of the Congestion Management Program (CMP) is identified as one of several places to ensure that bicycle improvements are identified for installation to help ensure their completion.
It is further recommended that the local input to developing ISTEA Management Systems, particularly those which address facilities management (bridges, pavements and transit facilities), include categories which track intermodal bicycle facilities. Pavement management systems for example, can include bicycle lane information regarding both location, type, size, and maintenance needs. Maintenance of bicycle lanes could be incorporated into ongoing pavement maintenance efforts in local jurisdictions. Striping efforts on existing roadways could be programmed to occur when pavement sealing or surfacing is scheduled. Transit management systems could include bicycle rack and locker locations and their extent as part of transit stops inventory information, while transit vehicle information can include bike rack information. Bridge inventories could be expanded to include overcrossing and undercrossing information on structures already included in bridge inventories. Local Geographic Information Systems (GIS) capabilities could be expanded to incorporate bicycle lane location, type, annual maintenance status, and needed safety improvements. This would provide a coordinated and readily updateable data base which local bicycle groups could help to maintain.
5. Phase II Bicycle Facilities
Additional facilities identified in Appendix D of The Regional Bikeway Study include the bicycle improvements to be installed at the time of interchange improvements. Some of the improvements are planned and integrated with the Measure D Strategic Plan schedule. Others are not included in the Measure D program and project definition is still at the alternative stage. These include:
- Route 154 and Highway 101 Interchange (south) years 1995 - 2000
- Route 154 and Highway 101 Interchange (north) years 2001 - 2005
Within the Study Area portion of the South Coast, an additional bicycle improvement has been identified for improvement: (Regional Bikeway Study, SBCAG, 1994)
- The construction of the Class I bikeway (Ortega Hill Bikeway) from Sheffield Drive to Evans Avenue, in Summerland years 2001 - 2005
Development of precise improvements and the associated cost estimates will be important prior to the funding and construction of those improvements not included in the Measure D program.
Figure 5-1 [not available] reflects typical probabilities for bicycling or walking based on land use densities and distance to work. The highest rates of bicycle or walking use are predicted when trips are less than a quarter of a mile in length and taper off dramatically at 1.5 miles. The average length of a work trip within the Study Area is about seven miles, however, The 1990 Census Analysis of Journey to Work Information (SBCAG, 1993) shows the percentage of bicycle use for home to work trips within Santa Barbara county in the Isla Vista Census Designated Place (CDP) at 49.5 percent, within the City of Carpinteria at 5.0 percent, in the City of Santa Barbara at 4.3 percent, and in the Santa Ynez CDP at 4.1 percent. Trip lengths within each of these areas are shorter in length than the seven mile average. Analysis methods used to predict bicycle mode shift were applied to trips of between one and six miles in length. Trip lengths of less than 1.5 miles within these areas will be the greatest source of forecast increases in bicycle trips.
5.1.4 Define, Fund and Construct Operational Improvements to Highway 101
Work with Caltrans to further define and implement operational improvements to Highway 101 including interchange improvements.
Roadway operational improvements are measures, actions and strategies which can be implemented, typically within the configuration of an existing roadway, to improve the efficiency of traffic control, management and flow along the roadway. As a result of these improvements, the roadway's traffic carrying capability is increased. Within the existing configuration of Highway 101 through the Corridor area, operational improvements can be implemented which would increase the efficiency of traffic flow and optimize existing traffic capacity along Highway 101. The following are the specific operational improvements recommended for the Highway 101 Corridor. Recognizing that limited resources are available to meet traffic demand, responsible agencies will need to provide the most efficient street and highway system possible.
- Caltrans, in association with the City and County of Santa Barbara, should
test and establish a ramp metering system on selected interchange on-ramps in
the Highway 101 Corridor in the South Coast.
- Design, fund, and construct programmed interchange improvements on Highway 101 at Milpas Street, La Cumbre Road, Route 154 north and south, and at Storke Road as programmed in the Measure D Strategic Plan.
- Define and establish an incident response program within the Highway 101 Corridor.
- Define locations for and establish a changeable message sign program to alert motorists to delays, accidents, and alternative routes.
- Define locations for and establish a Highway Advisory Radio (HAR) program within the South Coast Highway 101 Corridor.
Elements of detailed system operations plan for the South Coast area have been developed. Caltrans Districts 5 and 7, working closely with SBCAG and local jurisdictions, have programmed interchange projects on Highway 101 at Milpas Street, La Cumbre Road, Route 154, and at Storke Road in the 1994-1995 Federal Transportation Improvement Program for Santa Barbara County (SBCAG, 1995) and scheduled milestones to design and construct these improvements are found in the Measure D Highway Program Strategic Plan (SBCAG, 1995)
1. Ramp Metering
Caltrans identified ramp metering in the Santa Barbara area from Goleta to the Ventura County line as an element of their Traffic Operation Systems Plan. The purpose of ramp metering is to control the flow of vehicles entering the freeway to a degree that minimizes the disruption to traffic flow along the freeway. At the same time, Caltran's notes that for ramp metering to work successfully a system of parallel arterials with reserve capacity is required. Ramp meters should be installed at many of the on-ramps in the Highway 101 Corridor, with highest priority given to those ramps located at the western end of the Corridor. At two lane ramps, or where adequate right-of-way exists to improve a ramp with two lanes, ramp meter by-pass lanes should be provided for high occupancy vehicles, including buses.
Implementation of ramp metering will require close coordination between Caltrans and the local jurisdictions. If the metering constricts the flow of vehicles onto the freeway too severely, back-ups will occur along the ramps and, in the worst cases, onto the arterial system causing arterial traffic delays. An "equilibrium" will need to be established permitting the meters to provide a rate of flow of vehicles onto the freeway which minimizes disruption to freeway traffic flow, while at the same time accommodating a sufficient number of vehicles such that those vehicles waiting to enter the freeway do not queue onto arterial streets. Current and forecast intersection deficiencies (see Table 4-3 in Chapter 4 Section 4.2.1) underscore the absence of available storage space for vehicles on local roads at Highway 101 interchange ramps. Any ramp metering program must consider the availability of storage space for cars waiting to get on the freeway during peak periods. The ability for local jurisdictions to work with Caltrans to create the needed storage capacity will be critical to the success of any ramp metering efforts. The problem is exacerbated during peak periods when congested flow on Highway 101 itself results in congestion at the on-ramps.
Segments of the South Coast Community have voiced considerable concern regarding the installation of ramp metering on Highway 101. The use of demonstration programs during interchange reconstruction (e.g. Patterson Road) would help to maintain traffic flow during construction and would provide the community with first hand experience with ramp metering in the Highway 101 Corridor. Queing problems can be monitored and design considerations at all ramps could be evaluated prior to the full implementation.
2. Interchange Improvements
Several additional interchanges within the Corridor should be considered for improvements to bring them more in line with current Caltrans design standards and to improve safety and efficiency. Interchanges and auxiliary lanes which should also be considered for improvements include:
- Route 225 (Cabrillo Boulevard) at U.S. 101 This interchange should be reconstructed so that the southbound on and off ramps would be relocated to enter and exit to the right of freeway traffic. The Draft EIR for the Highway 101 widening project provided several alternatives for realigning the arterials surrounding the interchange to improve traffic flow and operations at the arterial intersections. These alternatives would need to be reconsidered within the context of a four-lane freeway configuration.
- Linden Avenue Due to the short distance between the southbound on-ramp from Reynolds Avenue to Linden Avenue, consideration should be given to building an auxiliary lane between the two ramps. Bicycle improvements are also planned for this interchange.
- Linden Avenue/Casitas Pass area The Draft EIR for the Highway 101 widening included several "design variations" for the redesign of the interchanges at Casitas Pass Road and at Linden Avenue to eliminate isolated ramps and provide better freeway access. All of these design variations assumed a six-lane freeway cross section and would, therefore, need to be reconsidered in the context of a four-lane freeway cross-section. Improvements to these interchanges should focus on eliminating the isolated ramps at Casitas Pass Road and North Via Real, and reconfiguring the eastbound off-ramp and westbound hook on-ramp at Linden Avenue to provide more efficient access.
- Sheffield Drive The left side ramp at Sheffield Drive is also significantly substandard by current Caltrans standards, not only because of its left side configuration but also because of the grade required on the on-ramp acceleration lane in order to bring traffic from the arterial below the freeway up to the level of the freeway in a fairly short distance. The Sheffield Drive ramp is a very low volume ramp. Due to the topography of this section of Highway 101, relocation of the ramp to the right side of the highway would require considerable engineering. While ultimately it would be desirable to eliminate this ramp or relocate it to the right side of the freeway, it should be a lower priority than other more heavily used ramps in the Corridor.
3. Electronic Detection Systems and System Monitoring Stations
Electronic detection systems and system monitoring stations provide real-time data on freeway conditions. In conjunction with ramp metering, electronic detection systems and system monitoring stations can automatically track the flow of vehicles along the freeway and manage the flow of vehicles entering the freeway traffic stream. The detection and monitoring systems also collect and store data which is useful for monitoring and evaluating conditions over time. (See Section 5.1.7)
The Caltrans' Traffic Operation System Plan identifies electronic detection systems and system monitoring stations for installation along Highway 101 at one-half mile intervals from Goleta to the Ventura County line. In conjunction with the installation of ramp meters, surveillance stations and surveillance loops could be installed at each of the interchanges. In addition, to meet the Caltrans goal of detectors at one-half mile intervals, intermediate surveillance stations would need to be installed between interchanges which were located more than one-half mile apart (approximately seven freeway segments within the Corridor).
4. Incident Response Strategy
In its four-lane configuration, Highway 101 traffic flow can be easily disrupted by "incidents" on the roadway. Incidents include accidents, debris in the roadway, trucks and/or trailers overturned, and stalled and broken-down vehicles. In order to maintain the highest possible levels of traffic flow along Highway 101, speedy and efficient incident detection and response is critical. Such rapid response is needed given the relatively few parallel routes available along the Corridor and their limited traffic capacity (e.g. SR 192). SBCAG should identify as a high priority the institution of traffic monitoring along Highway 101 in the South Coast. Recent plans to locate a Traffic Management Center (TMC) in San Luis Obispo have been canceled by Caltrans. Current plans call for the TMC to be located in Fresno County. Incident management is imperative along Highway 101 through the Corridor, particularly during peak weekday hours and Sunday afternoons and evenings. The objective of incident management is to ensure that incidents such as accidents or debris in the roadway, which could significantly disrupt traffic flow, are recognized, identified and corrected as quickly as possible. SBCAG should work closely with Caltrans Districts 5 and 7, to develop traffic operations monitoring along Highway 101, including the Sunday afternoon/evening periods, in the near term. In addition, arrangements should be made between SBCAG, CHP and Caltrans to fund and implement incident management response teams with practical proximity to the Highway 101 Corridor. The incident management response teams would respond to incidents along Highway 101 identified through traffic operations monitoring, coordinating the resources necessary to resolve the incident, provide interim traffic management and ultimately restore traffic flow along Highway 101 as quickly as possible. Incident management strategies should include freeway service patrols as dictated by traffic volumes and conditions.
5. Changeable Message Signs
Changeable message signs should be located to provide travelers current information on traffic conditions through the Highway 101 Corridor area in sufficient time to affect travel decisions. The Caltrans District 5 Traffic Operations System Plan includes provisions for changeable message signs along Highway 101 north and south of its junction with Highway 154 in Santa Barbara and north of Buellton, at the junction of Highway 101 and Route 246 in Buellton, south of the junction of Highway 101 and Highway 1 near Gaviota and at the junction of Highway 101 and Route 150 in Carpinteria. Due to the lack of equivalent parallel highway facilities to Highway 101 through the Corridor on which to detour traffic if incidents occur, the primary function of changeable message signs within the Corridor will be to keep motorists informed of conditions and the status of corrective actions. This may serve to reduce driver frustration and the likelihood of unsafe activities. However, opportunities for traffic diversion are very limited in the study Corridor.
6. Highway Advisory Radio (HAR)
Used in conjunction with changeable message signs, HAR can provide travelers more detailed current information on incidents and general traffic conditions. Motorists are informed of the highway advisory radio station by signs posted along the highway. Information such as estimated delay times and alternate travel options can be broadcast to travelers. HAR can be provided via 10 watt transmitters licensed by the Federal Communications Commission (FCC) for broadcast on AM radio, or via low power millawatt unlicensed transmitters. Typically, the broadcasts would be managed by a local responsible agency. Broadcasts would be managed by Caltrans and the California Highway Patrol. District 5 operated an HAR system in Monterey, however the HAR locations list included in Highway Advisory Radio, Design and Operations Guide (Caltrans, July 1994) lists no HAR operations in the District.
5.1.5 Initiate a Transit Oriented Land Use Transition Program
Educate the community regarding the relationship between transit
oriented development and intermodal transportation systems. Adopt the policy
basis for transit oriented design in local plans and regional growth documents.
Revise zoning and redevelopment designations to reflect transit oriented
development densities and allowable uses.
Transit-Oriented Design (TOD) is defined in Access: Communities and Transit-Oriented Design (L. Olsen, What is Transit-Oriented Design?, 1995) as including "higher density land uses and activities ... designed and located to encourage ridership on public transit." Regions that are well planned can support transit services through in-fill development by integrating the community around transit facilities to maximize the benefits of transit investment and maximize ridership. TOD can eliminate automobile trips and provide access to the circulation system to all members of the community.
Research has been conducted throughout the country to identify land use density thresholds that encourage TOD. In Portland, the Land Use, Transportation, Air Quality (LUTRAQ) study is considering land use alternatives to a suburban freeway. Population densities were studied to identify their impact on travel behavior. Table 5-2 summarizes the results of the analysis. To provide transit service during the peak periods, a minimum population density of 8,000 people per square mile is suggested.
The Public Transportation and Land Use Policy (B. Pushkarev and J. Zupan, 1977) study of the 1970s identified that population "densities of 7 to 30 dwelling units per acre were necessary to sustain significant transit use - in the range of 5 to 40% of all trips." Those recommendations were extrapolated to 1993, using average household size data. The Transportation, Congestion, and Density: New Insights study (R.T. Dunphy and K. Fisher, 1993) found that the recommendations ""would be roughly gross densities of 11,000 to 50,000 persons per square mile. Most of the US population, even in the major urban areas, lives at densities below the lowest values in this range." The authors further suggest that "travel would decrease in an area with households that tend toward small size, low auto ownership, and good transit service regardless of the area's population density" (sic).
Table 5-2
Residential Density and Travel Behavior
| Units/Acre | Lot Size (ft.) | People/sq. mi | Transportation Characteristics | |
|---|---|---|---|---|
| Gross | Net | |||
| 3 | 4.4 | 10,000 | 4,000 | Auto dependent; no transit support |
| 6 | 8.7 | 5,000 | 8,000 | AM/PM work-oriented transit service; local transit service |
| 12 | 17.4 | 2,500 | 16,000 | High level of transit service to employment centers, less for local trips |
| 24 | 34.9 | 1,250 | 32,000 | Walking and transit trips may exceed automobile trips daily |
| 48 | 69.7 | 625 | 64,000 | High level of transit service; extensive pedestrian activity |
| Source: Seskin, 1994. | ||||
The LUTRAQ study also identified the travel behavior associated with the size of employment centers. Table 5-3 summarizes the results. For efficient light-rail operation, twenty million square feet of development is suggested in employment centers.
Table 5-3
Employment Center Size and Travel Behavior
| Millions of Sq. Ft. | Acres needed @ F.A.R. | Transportation Characteristics for higher F.A.R.s | |||
|---|---|---|---|---|---|
| .25 | 1 | 5 | 10 | ||
| 2 | 240 | 60 | 12 | 6 | Bus service at half-hour intervals |
| 5-8 | 800 | 200 | 40 | 20 | Comfortably supports half-hourly bus service |
| 7-15 | 1,600 | 400 | 80 | 40 | Intermediate level of bus service |
| 20 | 2,400 | 600 | 120 | 60 | Frequent level of bus service/min. threshold for efficient light-rail service |
| Source: Seskin, 1995 | |||||
The Transit Cooperative Research Project: Transit and Urban Form study (S. Seskin, 1995) looked at the relationship between transit ridership and several demographic factors in Toronto, Washington, DC, San Francisco, and Portland. Figure 5-2 [not available] illustrates the relationship between transit mode share for work trips and the distance to the nearest rail transit station. The relationship differs for each city reflecting the range of land uses near stations. Residences located one-half mile from a transit station were observed to make between three and 40 percent of work trips by transit. Figure 5-3 [not available] shows the probability of a work trip occurring on transit, depending upon the number of automobiles in the household. A range of land uses and densities were analyzed; the highest probability of transit work trips would occur in a household with one automobile located in a dense area.
It is generally acknowledged that public transportation will, of necessity, play a far greater role in accommodating travel demand in the future, as the available capacity of highway infrastructure becomes increasingly limited. However, in Traffic Congestion: Federal Efforts to Improve Mobility (1989) the U.S. General Accounting Office concluded that the development of ample and well-managed transit by itself will not induce appreciable numbers of people to leave their cars at home. Experience shows that successful transit systems (bus or rail) exist in settings where land use patterns and population density can be well served, and where the cost of operating an automobile (as measured by money spent on tolls, parking or other direct charges, or by travel time delays) make transit very competitive with the automobile in terms of cost and convenience. The success of transit in the South Coast will depend on the degree to which the current setting can be altered, over time, to provide an environment in which transit can compete with the automobile.
The population density in the City of Santa Barbara, between 10 - 20 people per acre in the residential areas. Assuming the density of 8,000 people per square mile recommended in the LUTRAQ study, the land use densities in Santa Barbara in the vicinity of each freeway flyer transit station would have to significantly increase to sustain peak period transit service. The other estimates of population densities suggested above to sustain transit service are even higher and more unlikely of achieving in the South Coast.
The successful transition from an auto-dependent community to a community which supports a balanced transportation system offering a variety of modal alternatives will require, among other things, a reshaping of policies governing development and land use patterns. The commitment to modal alternatives to the automobile should be comprehensively integrated into the land development process. In Designing for Transit: A Manual for Integrating Public Transportation and Land Development in the San Diego Metropolitan Area, (San Diego County) it is recommended that "from the general plan to the final development permit, land use decisions and the expenditure of public funds should be predicated on the realization that the sustained economic development of our cities requires a new development pattern that can be supported by a balanced transportation system." The following five objectives are recommended as a basis for local and regional land use policy formulation:
- Transit Preference: Transit should be the preferred mode of transportation to meet urban mobility demands. Increased street capacity for general traffic should be limited to specific circumstances.
- Land Use Determinant: Activity Corridors, which could be efficiently served by transit should be defined through general plans. Growth should be directed to these Corridors. Access can be conveniently provided by public transit if sufficient density thresholds are achieved. Directing growth to transit Corridors will ensure the most cost-effective use of transit and the most direct form of access for nearby uses. Such focused growth will also promote efficient use of other urban facilities and services.
- Automobile Disincentives: Employer-provided long-term parking is a direct subsidy for automobile use (Shoup, 1995). Parking management has been shown to be an effective way to reduce the incentive for people to drive alone to work. Parking costs should be borne as part of the cost of driving, included with gasoline, insurance, and car repairs. Monies spent on providing parking spaces should be redirected to providing transit passes or other incentives for non-SOV travel. Local parking requirements would need to be amended to reflect this preference. The parking pricing demonstration described in Section 1.5.1 could serve as a local testing ground to assess the effects of eliminating free parking.
- Designing for Pedestrians: Walking is a critical part of a transit trip. Improving the pedestrian environment will make people feel comfortable walking from place to place. Pedestrian access should be a first consideration in building and infrastructure design. Streets should provide amenities that reinforce pedestrian activities. Examples include areas for resting, drinking fountains, protection from weather, and ground floor business that serve pedestrians.
- Providing for Public/Private Partnerships in Transit: The private sector should be included in helping to finance transit directly. Through the project review process, and based on the general and community plans, transit dedications or facilities should be included as normal infrastructure improvements.
Many of the objectives outlined above represent a significant departure from traditional planning priorities and objectives and, in many cases, represent a significant increase in density. The City of Santa Barbara is in the process of updating the Circulation Element of its General Plan. Many of the concepts contained in these objectives have been at the center of spirited community discussions regarding the direction of future land use and transportation policy making in the City. The process that has been occurring in Santa Barbara over the past months serves to illustrate that it will not be easy to redirect public commitment from an automobile-dictated infrastructure to one that fosters a diversity of modal alternatives. Also, because Santa Barbara is a significantly built-out, mature community, changes in land uses will occur very slowly as infill development continues and reuse begins to occur.
It would be several decades before changes in land use policy could sufficiently affect significant changes in land use patterns to produce changes in travel behavior. However, it is correct to assume that the process must begin with changes in the policies which direct land use and transportation infrastructure development, including general plans, land use and circulation elements, specific plans, master plans and Corridor plans, and associated implementing ordinances.
Improvement in Analytic Planning Methods: The SBCAG travel forecasting model is the primary countywide tool for evaluating the impacts of changes in land use or in transportation infrastructure on travel characteristics. Several enhancements to the SBCAG travel forecasting model are recommended in order to be able to support a future multimodal orientation to land use and transportation planning in the Corridor and in Santa Barbara County as a whole.
First, with the significant existing and forecast commute patterns between Santa Barbara and Ventura County, the geographic area covered by the SBCAG model should be expanded to include Ventura County on the south. With an expanded model area, it will be possible to model the potential impacts of significant growth in both population and employment in Ventura County on Santa Barbara. It would also make it possible to forecast with far greater reliability the likely effects of enhanced transit services on travel demand between Ventura and Santa Barbara.
This leads to the second recommended enhancement. If the development of transit alternatives to the automobile is a priority in future transportation planning and implementation, the mode choice modeling capability of the SBCAG travel forecast model should be enhanced. The incorporation of a mode choice model which could reflect the relative attractiveness of a variety of mode choices (bus transit, rail transit, carpool and drive alone) given a range of time and cost variables, would provide a far better indication of the likely usage of future transportation projects of all modes.
Finally, the SBCAG model should be re-calibrated to produce peak period forecasts. Average daily forecasts are adequate tools for Corridor level planning. But in order to refine alternatives and develop detailed programs for implementation, it will be necessary to assess the potential peak period impacts of alternatives.
5.1.6 Visitor/Tourist Auto Trip Reduction Program
SBCAG, Traffic Solutions and MTD should work with local Chambers of Commerce, and the Convention and Visitors Bureau should enhance multimodal information in promotional and special event materials.
Visitor and tourist trips have a substantial impact on traffic conditions along Highway 101, particularly on weekends (Friday and Sunday evening peak periods) and during peak summer months. The vast majority of visitors and tourists in Santa Barbara are visiting from locations outside of Santa Barbara, The 1990 survey by the Conference and Visitors Bureau found that only 14 percent of the visitors were traveling alone, with the remaining 86 percent accompanied by one or more people (50 percent traveled in groups of two). This limits the degree to which local policies (such as the TDM program for employers) can be applied as most tourists are already "carpooling". Also, tourism provides a significant source of revenue to the Santa Barbara economy and tax base. It would, therefore, not be desirable to discourage visitors from traveling to Santa Barbara. However, innovative promotions and incentive programs can be implemented to induce visitors to use alternative forms of transportation to the automobile for travel to and from Santa Barbara, and for local travel once in Santa Barbara. SBCAG, Traffic Solutions, and MTD should work cooperatively with the tourist supported businesses and groups to develop greater awareness among visitors of alternative modes. These programs and strategies could include:
- Applying the cost of the visitor's AMTRAK fare to hotel charges or coupons for meals or merchandise.
- Transit or shuttle passes included with a visitor's hotel registration.
- Bicycles provided free or at a reduced charge to hotel guests, particularly in the downtown and waterfront areas. Work with waterfront hotels to make Chamber of Commerce maps to local attractions available at bike rental outlets.
- Financial incentives (discounts) for off-season travel.
- Develop or enhance existing tours (walking, bicycling, bus or shuttle) to local activities and tourist attractions.
- Enhance This Week in Santa Barbara to include more information on transit and bicycle opportunities to get to tourism sites. Include the transit routes on the publication's centerfold map of the area. Add MTD bus route numbers which run by each of the locations and activities write-ups in "This Week's Calendar", Incorporate transit connections from the major hotel areas to the week's special event (e.g. Santa Barbara Harbor Festival, the Goleta Food and Wine Festival, or the Santa Barbara Wine Auction Weekend). Add a new section which emphasizes how to get around Santa Barbara without an auto. Include a specific mention of the Waterfront Shuttle and the State Street Shuttle to provide access around downtown.
Enhance the Santa Barbara Chamber of Commerce brochure A Walk Through Old California, Santa Barbara's "Red Tile Tour" to include more information on transit and shuttle service connections from various parts of the City to this area. Include text which suggests using the MTD services and the shuttles after the "look for this symbol for your free downtown shuttle" text. Enhance the Santa Barbara Area Map (reverse side) descriptions of the Scenic Drive Points of Interest to include transit routes which can be used to take the scenic drive. These sites are the places where reduced entrance fees for transit access should be considered.
Use special event brochures (e.g. special supplements to Santa Barbara Magazine for the Santa Barbara Wine Auction Weekend) to incorporate transit, bicycle and pedestrian approaches to the activities and locations. Special shuttles for events could be considered from participating hotels to the key activities. The Chamber of Commerce could take the initiative with event sponsors to coordinate with MTD to provide information for the brochures and for special shuttles.
5.1.7 Monitor and Report on Performance of Highway 101 and the Multimodal Transportation Strategy
Monitor performance of U.S. 101 and traffic trends and share information with public and elected officials regularly and periodically. Use the performance results to prepare a review of and recommend adjustments to the Multimodal Transportation Strategy
Monitoring based on enhanced data collection becomes the corner stone of a strategic implementation program by providing the basis for regular reassessment and adjustment of multimodal strategies, schedules and actions. Effectiveness of the many action elements of this alternative to the widening of Highway 101 can be assessed against the changes in travel in the Highway 101 Corridor. Monitoring also provides information which will help to optimize the available capacity within the Corridor. The following are the four components of the monitoring and reporting program:
- Expand existing Caltrans and local agency traffic and travel monitoring
efforts.
- Traffic volumes
- Average vehicle occupancy
- Travel speeds and levels of congestion
- Accidents
- Trip purpose and components of travel
- Origins and destinations
- Effects of Tourist Promotional Efforts
- TDM Monitoring
- Traffic volumes
- SBCAG, with input and financial support from Caltrans and local agencies should create a "State of the Corridor" newsletter.
- Develop a Funding Strategy for the enhanced monitoring and reporting efforts.
- Prepare three to five year evaluation reports which compare the implementation status and effectiveness of individual action elements with the Highway 101 monitoring reports. Develop adjustments and revisions to the action items list in response to the results.
Descriptions of each of the four components of the enhanced monitoring action are discussed in more detail below.
1. Expand the Monitoring Effort
The conditions which should be monitored periodically, on a regular schedule, within the Corridor include:
- Traffic volumes: Caltrans publishes Traffic Volumes of California State Highways annually. The report provides annual average daily traffic for each count location along all state routes in California. For the Highway 101 Corridor, counts are provided for the segments of highway between every interchange in the Study Area. In addition, peak month ADT, or the average daily traffic for the month of heaviest traffic flow is also provided. This data is provided because Caltrans recognizes that on many routes, Highway 101 among them, variation in traffic volumes occurs during certain seasons of the year. Estimates are provided of peak hour traffic at all count points. Beginning in 1991, peak hour volume data by direction are provided for selected locations. However, this information is not provided for any segments along Highway 101 within the Corridor.
- Efforts should be coordinated with Caltrans District 5 to collect peak hour traffic volume data, by direction, at several, if not all, segments of Highway 101 through the Corridor on a bi-annual cycle. Directional peak hour traffic counts will require additional effort by and funding for Caltrans to perform this work.
- Average vehicle occupancy: Average vehicle occupancy within the Corridor should be evaluated every five years. AVO can be determined using video sampling to videotape a time sample of traffic flow to record the occupancy of each vehicle in the traffic stream. These studies would most likely be conducted by SBCAG in coordination with Caltrans.
- Travel speeds: Speed studies should be conducted to monitor average (weekday and weekend) daily and peak hour travel speeds along Highway 101 in the Corridor. These studies should be conducted every two years during both peak and off-peak travel months. At the present time, Caltrans has discontinued speed studies due to lack of funding.
- Accidents: Accident data is currently maintained by the California Highway Patrol and Caltrans for all California state highways. This information should be obtained quarterly for the Highway 101 Corridor in order to track accident trends and identify high accident locations.
- Trip purpose/components of travel: The intercept license plate travel survey should be repeated on five year cycles (along with the AVO survey), to update information on trip purpose and the components of travel (internal, internal-external or external) within the Highway 101 Corridor. These studies should be coordinated with Caltrans and the California Department of Motor Vehicles. Intercept surveys will follow the same process used in this study, with video taping of license plates, address matching through the Department of Motor Vehicles, and the mailing of surveys to vehicle owners whose vehicle has been recorded driving through the Study Area.
- Origins and destinations: The intercept travel survey updates will also provide the opportunity to monitor geographic distribution of travel in the Highway 101 Corridor. This will be particularly critical as the RGF '94 population and employment forecasts play out. One of the key trends to monitor will be the commute pattern between Ventura Counties Santa Barbara and as both Ventura County and the northern portion of Santa Barbara County continue to develop.
- Effects of Tourist Promotional Efforts: A monitoring program should be developed as part of the tourism and travel consortium's incentive programs. Use of incentives could be monitored by those who provide the incentive and those attractions which benefit from the incentive. Costs of the program (e.g. transit subsidies) should be tracked to develop an overall cost effectiveness. The Conference and Visitors Bureau should consider expanding their periodic surveys to include measures of promotional activities.
- TDM monitoring as described in Section 5.1.1
2. Create a "State of the Corridor" Newsletter
The results of the periodic monitoring should be made available to policy makers and the public on a regular basis. The Highway 101 Corridor is clearly valued as a unique feature and visual resource of the community by the residents of South Coast, as well as those traveling through the area. Providing regular information on the status of the Corridor to as broad a segment of the population as possible will educate more people on the issues and concerns related to the Highway 101 Corridor, and the state of transportation and circulation in Santa Barbara in general. This study has served to raise the issue of the most appropriate approach to accommodating future travel demand in the Highway 101 Corridor and has resulted in a variety of opinions. The next step is to involve as much of the population as possible, and particularly the users of the Highway 101 Corridor, in refining and implementing the multimodal transportation strategy. This could be accomplished by providing widespread distribution, at least annually, of a "State of the Corridor" newsletter. The newsletter can serve as a report card to the community on the implementation progress of the multimodal transportation strategy.
In addition to supplying the most current monitoring results, the newsletter should restate the problem, summarize the actions being taken, and identify ultimate objectives and progress towards those objectives. Editions could also highlight the parking pricing demonstration program, the TDM ordinance revision, education efforts regarding transit oriented development and the hidden cost of auto ownership, the activities and promotions of the tourist and travel consortium and adjustments and revisions to the multimodal transportation strategy. Space for community debate about individual actions or program effectiveness could also be considered.
Distribution should extend to:
- local elected and appointed officials,
- those who participate in the TDM ordinance review and revision process,
- employers and employees who are subject to the TDM ordinance,
- the tourism and travel consortium participants,
- those who participate in the pricing demonstration project development,
- business and community groups and associations which participated in this study,
- local print and broadcast media, and
- others by request or by recommendations of participants.
3. Funding Strategy - Enhanced Monitoring
To the extent possible, existing monitoring programs are expected to provide data regularly. Caltrans and local agencies currently collect many of the data items, however, as noted above, funding limits at the state level have reduced data collection for speed studies and directional counts. Intercept surveys are not regularly conducted. Several of the recommended monitoring activities, the "State of the Corridor" newsletter, and the periodic Multimodal Transportation Plan strategic review and revision will require funding. A strategy to identify and program funding for these components should develop up-to-date cost information, and be incorporated into the SBCAG overall work program. Participation in this funding should come from the County and local cities within the Corridor. Caltrans participation is extensive due to its mandate to maintain and operate the state highway system.
4. Multimodal Transportation Plan Strategic Review and Revision
SBCAG's Regional Transportation Plan (RTP) updates provide a logical and readily available place to present a Highway 101 Corridor multimodal transportation plan strategic review and provide recommendations for adjustments. The RTP's needs assessment section can incorporate the results of the regular monitoring program. The status of the individual elements of the Multimodal Transportation Plan should be included in the action element of the RTP. Funding strategies should be consolidated into the RTP's financial element with revisions reflecting the creation of new funding sources or the reallocation of existing funding sources between elements. As all modes are reflected in the RTP, each of the modal components of the Multimodal Transportation Plan can be evaluated both for funding and a performance. The results of the data collection and monitoring of each of the multimodal strategy components should be assessed to determine which components are working as planned and which are not. For those components which are not performing up to expectation, adjustments should be made or alternative components substituted.
5.2 Implementation, Scheduling and Monitoring
The recommended multimodal transportation strategy will be implemented through regular cycles of monitoring Highway 101 Corridor performance and adjustments to actions by implementing agencies in response to the results. This strategic implementation approach is the essential component of the entire recommendation. The ability to respond promptly to actual performance levels of implementation actions, as measured by Corridor roadway performance characteristics, is unique to this alternative to the highway widening. Such responsiveness is a challenge in the multi- agency arena in which decisions and actions will be made. The ability of SBCAG MTD, Traffic Solutions, individual cities, the County, SBCAG and others to act and respond to the monitoring results will directly effect the success of the strategy.
Thresholds of Significance Which Require Adjustments to Implementation Actions. A threshold of significance is essential to determine whether performance monitoring results require adjustments or acceleration of actions. Separate thresholds are recommended for highway, local roadways, express transit service, and TDM performance. Recommended thresholds are:
- Highway 101 Performance. A traffic level of service level (LOS) of E and average operating speeds of 40 miles per hour on Highway 101 for consecutive segments of the highway totaling 3-4 miles in length over two consecutive years.
- Local Roadway Performance. Level of Service D for CMP intersections as adopted in Santa Barbara's current Congestion Management Plan (SBCAG, 1995).
- Express Bus Service Performance. Express bus transit ridership of 35 or more riders per revenue vehicle hour.
- TDM Performance. Individual employer attainment of existing TDM ordinance performance standards (average regional average of 6 percent over baseline) through 1997 and to the revised standards after the 1997 ordinance revision cycle. Employer based share of TDM trip reductions will not be expected to exceed the estimated 10 percent reduction in home based work trips.
No individual performance thresholds are recommended for bicycle, highway operational improvements, transit oriented land use, or visitor tourist trip reduction program elements as their impact will be reflected in the four measures above. Performance thresholds are based on existing industry or local standards and generally are reflective of current monitoring programs or can be easily calculated from existing nationwide or recommended data collection efforts. At the time when employer based travel demand management programs achieve the maximum expected performance, an additional performance threshold should be established with the selection and development of a parking pricing or other type of pricing strategy to continue to monitor home to work trip reductions. Monitoring results should take into consideration roadway incidents occurring during traffic counts and speed and delay studies, and highway operational improvement construction or demonstrations.
How to Implement Monitoring and Adjustment Cycles. Implementation of actions in the first period (1995 - 2000) of the program will establish the basis for performance monitoring. Enhanced monitoring efforts should begin after SBCAG board action to select this alternative. The first two to three cycles of monitoring reports should be used to shake out reporting information, formats, timing and the multiple system evaluation methods and discussions. Early years should focus on reporting on and identifying what has been implemented and the status of other items. Comparison with performance thresholds should be made, however the first program adjustment cycle should be initiated in the fifth year, after the revised TDM ordinance has been completed. Express bus service is expected to be phased in incrementally. Failure to implement funding sources for transit operations during this first phase may result in the choice between instituting a pricing program (a funding choice in and of itself) or returning to the highway widening alternative. Funding actions will require actions by individual agencies as well as SBCAG overall. These should coincide with regular TIP, SRTP and capital improvement program cycles.
Periods 2 (2001 - 2005) and 3 (2006 - 2010) adjustment and monitoring cycles are expected to begin to indicate which elements are achieving targets and which are falling short of desired thresholds. Adjustments to the actions may be presented in the form of choices. LOS failures on the Highway 101 may require adjustments to both the TDM elements and the transit services. Additional revisions to the TDM ordinance may be required during this period. Revisions in transit route coverage, adjustments to service frequencies and/or operating periods may need to be made by MTD. During this period monitoring should determine whether the employer component of TDM trip reductions is reaching theoretical thresholds (10 percent of the total trip reductions needed in the corridor to achieve LOS standards on the highway and at the CMP intersections). Recommended actions should be developed cooperatively with the multiple agencies as each will require separate agency actions.
The Period 4 (2011 - 2015) adjustment and monitoring cycle will need to consider actions to address the post 2015 forecast traffic. Review of changes to land use densities in the vicinity of freeway bus stations could begin during this period. Adjustments to TDM strategies may need to consider expansion of or increases in cost to any pricing strategy which has been implemented to date in the Highway 101 Corridor. Ongoing regional planning may serve to set a direction for the future in the corridor which could include a continuation of these actions, a construction alternative or new technology activities. It is impossible to speculate what this future may be within this study.
More detailed schedules for individual action item implementation follows. The recommended schedules are only suggestions, as overall travel performance in the corridor, as measured by the recommended thresholds, will determine the need to accelerate implementation. Actual timing for individual actions beyond the initial 3 to 5 year start-up period must be accelerated if congestion levels increase at a faster pace than actual traffic reductions occur as a result of mode shifts. Adjustments will require, at some time in the second or third period, a choice of implementing a pricing strategy or returning to the highway widening alternative. This will be a difficult choice for the South Coast whenever it occurs.
5.2.1 Schedule and Monitoring Approach for the Enhanced TDM Actions
Schedule. The first five year time frame, between 1995 and 2000, is when most activities for enhanced TDM actions are scheduled. The longer lead time for results in these areas underscores the need to begin the transition to a multimodal transportation strategy immediately. Timing of enhanced data collection, revised ordinance performance monitoring, the expanded promotional activities, and the expanded education program is expected to be ongoing throughout this study's 20 year time horizon.
Annual work programs for Traffic Solutions would reflect increased time for implementation of data compilation both due to the increased numbers of employers reporting and the effort to identify successful strategies to subareas of the county. The expanded public education program focus on hidden costs of auto subsidies may require some initial research by Traffic Solutions staff early in the first five year period to develop education materials and to expand their existing information programs. The TDM ordinance review and revision effort is one which has been planned for by Traffic Solutions and therefore is not expected to result in a change to scheduled work.
The controversy surrounding the discussion of any pricing approach to achieve significant automobile trip reduction necessitates an early start to the design of a demonstration program. Demonstration program design and scope should be initiated upon the decision of SBCAG to proceed with this multimodal transportation strategy alternative to the Highway 101 widening. Development of consensus between business community and participants on the study design, duration, and methods for evaluation optimistically will take a year to complete. Completion of the study design prior to 1996 will provide local congressional representatives with the ability to pursue demonstration program funding during ISTEA (or its successor) re-authorization expected in 1997. The demonstration program itself is recommended to occur during the later part of the five year period, in order to have program results and recommendations regarding a long term program completed by the start of the second five year period. Implementation of a more permanent, more wide-spread program will need to based on the demonstration program results and will certainly generate significant community discussion.
Development of a funding strategy for this Enhanced TDM Action program should be initiated upon the decision of the SBCAG board to proceed with a multimodal transportation strategy. Elements of this strategy will be completed after recommended special reports and studies are completed. The funding strategy should be completed prior to the re-authorization of the federal ISTEA, and should serve as input to the upcoming RTIP cycle in 1997.
Monitoring. Existing annual reporting systems of employers to Traffic Solutions and by Traffic Solutions to the SBCAG board should be used as the primary reporting and monitoring approach for the recommended, enhanced TDM actions. Data collection and ordinance effectiveness will primarily be based on employer reports to Traffic Solutions. Special reports will be needed for three of the actions:
- The pricing demonstration program. A series of special reports
will be necessary to establish a pricing demonstration project in the Highway
101 Corridor. SBCAG could use the existing TAC and CAC from this Highway 101
Alternatives study as an advisory group to develop recommended demonstration
program goals, approach, duration, implementation procedures, and evaluation
measures. SBCAG should serve as the lead agency for this program and either
prepare technical development materials in-house or use outside consultants to
prepare them. Evaluation measures should include ways to quantify:
- changes in mode shift and in AVR,
- changes in retail sales volume which could be attributable to a change in parking costs,
- changes in employer costs if free parking is still provided to employees,
- social equity of the parking pricing strategy and other items the community feels are important.
- The enhanced TDM action funding strategy. Traffic Solutions and SBCAG should develop a special report to the SBCAG board, individual Corridor city councils, and community associates which sets forth a funding strategy to identify overall development and implementation costs, as well as sources of revenues for each of the items in the Enhanced TDM Action element. Annual reports on funding obtained, revenue generated, and cost updates should be included in Traffic Solutions ongoing